ACE Mahagun Medalleo
ACE Mahagun Medalleo Photos, Plans & Gallery
Artist's impressions, courtesy ACE GroupACE Mahagun Medalleo: a joint project on about 10 acres in Sector 107
ACE Mahagun Medalleo is a 3 and 4 BHK project on about 10 acres in Sector 107, Noida, built jointly by ACE Group and Mahagun. It is registered with UP RERA as UPRERAPRJ125561, under the project name Mahagun Medalleo, with a declared completion date of 7 September 2029. The register records zero complaints against it.
Of the projects on this site, this is one of the cleaner RERA records. The registration was taken out on 26 September 2022 for an 84 month build, the completion date has not passed, and no complaints have been filed. That is worth saying because it is not true of every project in this price bracket.
ACE publishes two clubhouses, a forest trail through the site, an all weather swimming pool, a sports arena and IGBC Gold certification. It does not publish a size table, a price list, a tower count or a unit count, so everything in that part of this page comes from property portals and should be treated accordingly.
The portals disagree with each other quite badly. One gives six towers of G+29, another eight towers. One prices the project at ₹5.25 Cr to ₹15.64 Cr, another at ₹4.25 Cr to ₹6.32 Cr for broadly the same homes. We have shown both rather than pick one.
What stands out
Ask us for the developer’s own size and price sheet rather than working from portal numbers.
Request PricingMedalleo’s August 2026 construction update
This is ACE Group’s own construction update for August 2026, posted in September and running under three minutes. It is the most recent developer footage of the site we could find.
Use it to check the stage each tower has reached against the completion date on the RERA record rather than against the brochure.
Ask us about this projectACE Mahagun Medalleo sizes and price
Neither ACE nor Mahagun publishes a size table or a price list for Medalleo. Everything below is portal-sourced and the sources disagree, in some cases by a factor of two. We have shown the range rather than a single figure, and we would get the developer’s own cost sheet before taking any of it as settled.
*No developer price exists. Portal rates run from about ₹16,950 to ₹17,000 per sq ft. One portal extends the 4 BHK range to 7,450 sq ft and quotes up to ₹15.64 Cr, which no other source supports. Stamp duty, registration and club charges are extra.
Portal sizes on a super area basis. No developer table exists.
ACE Mahagun Medalleo amenities
The first group below is what ACE publishes on its own project page. The rest comes from property portals and is not confirmed by the developer.
ACE describes two clubhouses, which is unusual at this size, and IGBC Gold certification, which is a specific claim you can ask to see evidence of.
Where ACE Mahagun Medalleo stands
Registered as UPRERAPRJ125561 to Mahagun Infratech Private Limited on 26 September 2022, for an 84 month build.
Listed under ongoing residential projects on ACE’s own site.
The declared completion date on the register is 7 September 2029.
No developer possession date published. One portal says December 2029, which does not match the register.
Buying at ACE Mahagun Medalleo? Check these first
Ask for the developer’s own cost sheet and size table in writing. The portal figures for this project disagree with each other by a wide margin, and one portal quotes a 4 BHK up to 7,450 sq ft and ₹15.64 Cr that no other source supports.
Ask for the carpet area, which nobody publishes, and ask to see the IGBC Gold certification rather than taking the claim at face value. For another joint venture project nearby, see Godrej Palm Retreat.
ACE Mahagun Medalleo location: Sector 107, Noida
Sector 107 sits between the Noida Expressway and the older central Noida sectors, which gives it better access to the city than the sectors further down the expressway.
Portals put the Sector 101 station on the Aqua Line about a kilometre away and Indira Gandhi International Airport about 42 km by road. ACE does not publish distances, so these are portal figures. See what else is in the area in Sector 107.
Distances are portal-sourced. ACE publishes no distance figures. Actual travel times vary with traffic.
ACE Group and Mahagun
Medalleo is a joint project. ACE Group markets it and Mahagun Infratech Private Limited is the promoter on the RERA registration. ACE also built ACE Arte in Sector 150 and ACE Edit on the Yamuna Expressway.
Mahagun has been building in Noida and Ghaziabad since the 1990s. The registered office on the RERA record is A-19, Sector 63, Noida.
ACE Mahagun Medalleo is a joint project of ACE Group and Mahagun, registered to Mahagun Infratech Private Limited.
ACE Mahagun Medalleo: frequently asked questions
Compare with similar projects
All Noida Expressway projects →Interested in ACE Mahagun Medalleo?
Tell us what you are looking for and we will get you the developer’s own size sheet and cost sheet for Medalleo rather than portal numbers, and set up a site visit. There is no brokerage to pay.
Disclaimer: the RERA number, registration date, completion date and complaint count on this page are from the UP RERA register. The land area, clubhouse detail and IGBC claim are from ACE Group’s own project page. Neither developer publishes sizes or prices, so those figures are portal quotes captured in September 2026, they disagree with each other, and they are labelled as such. We hold no photographs or floor plans for this project that we can publish. Please verify the RERA registration on up-rera.in before you pay anything.


